Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Other (infrastructure-related) |
Tags: | catchupcorner, drainage, flood, flooding, gulley, ouse, passingthetimeofdayplace, pip, postclementhorpefloodworks, riverouse, rowntreepark, terryavenue, york |
Date time: | 3.25pm, Thursday 28th July, 2022 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[Image taken 28.7.22] Terry Avenue (Millennium Bridge, end) York. [NOTE: No street view at this location] When the River Ouse rises it can flow through drainage pipes along this route to enter into Rowntree Park – a catchment area. When the river level falls I assume the process is reversed. Other image this location today: #185140.
Comments reflect the views of the original submitter only.